Oregon revised its estimates for the same school year. In Canby, a $1.64 million drop in the state grant translates into a $51,885 drop in combined funding. Compare the two worksheets for all 29 districts.
The district counts on four fewer bus routes and would keep paying to maintain both buildings. Its worksheet shows how much each change saves and where students would go.
PPS modeled staffing reductions with and without consolidation. Read the figures, what may be reinvested in receiving schools, and how to weigh in at Benson on December 3.
Portland Public SchoolsSchool consolidationPublic budgets
A November 27 amendment would replace the proposal’s minimal-risk test with an agentic-AI definition. The official December 2–3 agenda was still absent after its stated posting time.
Portland City CouncilPublic recordsArtificial intelligence
The County forecasts a $22.9 million recurring General Fund gap for fiscal 2028 and larger gaps through 2032. Half of a separate one-time estimate is assigned to facilities and IT, while a refund allowance remains unresolved.
The general-fund forecast improved by $72,799 in October but remains $573,057 below August. A three-month comparison shows the opening-balance revision and the assumptions still carrying the year.
The 90 annual awards total $3.723 million. But their base-award rows add to $2.873 million—$216,750 above the City schedule’s printed subtotal. Proof of expanded access comes later.
Arts Access FundAudit follow-throughReproducible calculation
Portland’s $11.7 million funds the whole Gateway corridor. A 2019 worksheet put beacons, lighting and signal connections at four crossings at $800,000. What would those four crossings cost under today’s design?
What changed · November 20, 2026Two public funding totals differ by $92,580. A Metro record helps explain the difference. Council’s next decision concerns property rights for construction.
90 nonprofits. Two years. A closer look at the purpose, the process, the financials—and the questions still worth asking.
What changed · November 20, 2026Montavilla Jazz Festival and Portland Taiko each received a $37,250 annual award. Their ticket offers give residents a starting point for judging what the grants change.
Correction · November 20, 2026Portland Public Schools lists Benson High School Auditorium for the December 3 listening sessions. The story now includes the updated location and meeting times.
90 recipients269 financial periodsInteractive explorer
A firm preparing a proposal for the Sandy River crossing asked whether to send its fees separately. In its November 24 answer, Clackamas County directed firms to upload the fee proposal and all other documents together through Bid Locker. The county said the separate-proposal language in section 5.3.6 came from an older template. OregonBuys still lists December 3 at 2 p.m. Pacific for the opening.
The November 23 agenda asks directors to let the district consider qualifications alongside price for four projects covering windows at Tualatin High, theater lighting, playgrounds and fire alarms. Staff cite the short summer construction season. The draft playground findings estimate $4.8 million across five campuses. The four advertised hearing times and the 4 p.m. speaker signup deadline have passed. The regular board meeting is scheduled for 6 p.m.
Multnomah County plans to close the snow gate near milepost 10 on Wednesday. That cuts off vehicle access to the Sherrard Point trailhead parking lot at milepost 14.5, about 4½ road miles beyond the gate. The county says the winter closure limits the risk of drivers getting stuck and saves the cost of plowing a stretch with no homes. Its notice gives no dollar figure or exact closing hour.
Gladstone wants a firm to represent the district while it replaces roofs, upgrades heating systems and improves school security. Its November 23 request gives 30 written points each to the firm’s experience, the lead manager’s experience and the proposed approach. Fees account for 10 of the 100 written points. An optional interview can add 50 points. The district expects to negotiate a fee with the selected firm.
Beaverton School District and Oregon School Employees Association Chapter 48 scheduled their first bargaining session for November 20. Under their three-year contract, this round covers classified staff pay and health insurance in the final year. This year’s 5% cost-of-living adjustment is already set, along with a $2,131 monthly district contribution cap for full-time classified employees. The district’s session page showed no new terms when checked November 20.
Canby’s long-range facilities committee added a December 10 meeting from 4 to 6 p.m. Pacific at Philander Lee Elementary, 1110 S Ivy St. A week earlier, December 3, its calendar lists a 3:30 p.m. tour at William Knight Elementary followed by a 4–6 p.m. committee meeting at the district office. The district says this committee prepares a facilities plan. School-consolidation recommendations are outside its assignment.
Colton’s school board scheduled its next four-part strategic-planning session for Monday, December 7, from 5:30 to 7 p.m. Pacific. The agenda sets aside just over an hour for separate groups on student success, staff culture and leadership, facilities maintenance, and community relations. They reconvene at 6:40 to share their findings. The November 16 work session used the same structure.
District 1 opened the competition for a countywide affordability study at 8 a.m. November 20. On April 30 the county board voted 5–0 to authorize $100,000 in one-time General Fund contingency money for it. Staff described a focus on households above the poverty line who struggle to cover basics such as housing, child care and groceries. Proposals are due January 4 at 4 p.m. A contract price has yet to be posted.
Portland City Council District 2 · District brief ·
Portland Permitting & Development published plans on November 20 for lights suspended across the plaza between Albina One and the Paramount Apartments in Eliot. Cables would attach to the facing walls of the existing buildings. The Housing Bureau reports 94 affordable homes at Albina One. City permitting staff will consider the design guidelines and written comments before approving the application, adding conditions or denying it.
Washington County’s November 20 report at 4 p.m. counted 5,846 votes against and 4,034 for the proposed $29.5 million police facility bond. Opposition was 59.17% of the 9,880 votes cast on the measure. Since the morning count, 88 more no votes and 33 more yes votes widened the gap by 55. The returns remain unofficial.
Forest Grove’s school board scheduled a virtual discussion for Tuesday, November 24, noon–1 p.m. Pacific. Its draft 2027 legislative platform asks Oregon to fund 40 hours of reading instruction training for K–3 teachers, K–12 reading interventionists and elementary principals. It also proposes a statewide interim assessment validated in English and Spanish and a limit of three state-vetted curriculum choices per subject. The agenda calls for discussion only.
Oregon’s November 20 districtwide count at 4 p.m. showed 36,152 yes votes and 20,617 no votes on Measure 34-355. That is 63.68% of 56,769 votes on the measure, with certification still to come. The district’s five-year plan includes roofs, heating and cooling, school security and career training.
PPS’s public notice confirms a Nov. 21 listening session on the superintendent’s school-closure recommendations, from 1–3 p.m. At McDaniel High School, 2735 NE 82nd Avenue. The notice provides a live broadcast and accepts written comments at PublicComment@pps.net. Readers seeking a speaking slot can contact the Board Office at 503-916-3741. The calendar also lists a Dec. 3 student hour at Benson from 5–6 p.m., followed by a general session from 6–8 p.m. All times are Portland time. These are listening sessions ahead of the scheduled Dec. 15 board vote.
An October finance worksheet dated November 20 projects $41.18 million in General Fund resources and $40.80 million in spending, leaving $389,178 at year end. Higher salary projections are offset by lower projected benefits. The report cautions that these estimates will change. It is on the November 23 board agenda, giving residents a chance to ask what is driving the revisions.
The county’s schedule for the week of November 23 lists curb-ramp work on Monday along Buxton Road at Second, Third and Fourth streets. Most affected ramps are expected to close for one to two weeks, with signed pedestrian detours. Multnomah County budgets $600,000 from its road fund for the project.
Washington County moved its optional meeting for treatment providers to November 23 at 1 p.m. on Teams. The county seeks residential substance-use treatment for eligible adults beginning July 1, 2027, under a one-year contract renewable for up to five years total. Bidders must supply annual and five-year budgets. The county left its estimated expenditure blank. Questions are due November 24 at 5 p.m. and proposals December 7 at 4 p.m.
North Plains City Council voted 4–0 on November 19 to appoint Mark De Forge mayor. He took the oath and resigned his council seat that night. The recall petition for that seat had qualified on November 13, and November 18 was the last day his resignation could cancel the election. Washington County confirmed on November 20 that city voters will still receive a December 15 recall ballot. The city says it will address how to fill the vacant seat at a future meeting.
On November 19, Portland City Council advanced an ordinance to continue a property-tax exemption for nonprofit affordable housing. For the current tax year, the Housing Bureau counts 17,389 low-income homes and 67 nonprofits across 700 properties. Portland’s audited accounts show the city forgave $8.28 million in property tax under this program in the year ended June 30, 2025, up from $7.31 million a year earlier. The ordinance would align Portland’s January 1, 2027 sunset with state law, which now runs to July 1, 2033.
The November 19 board agenda lists the next policy committee meeting for December 3 at 7 p.m. At the district office, replacing the November 30 date in the prior agenda. The later record also lists December 10 and December 17 board meetings. It does not yet specify the policy committee’s topics.
North Clackamas School District · District brief ·
The district’s November 19 report puts Grade 11 math proficiency at 24.8%, up from 13.2% a year earlier, and English language arts at 46.9%, up from 36.7%. Math proficiency fell in grades 7 and 8. The district also introduced separate fall interim-test baselines and plans its first same-test growth comparison in winter 2027.
Multnomah County commissioners voted 5–0 on November 19 to allocate $1.6 million for winter and severe weather, $1.4 million to sustain housing support for 250 voucher households and $1.4 million to help families move into permanent housing. Of the $19,844,513 in carryover, $15,444,513 went to a regional obligation, stabilization reserve and contingency. Higher tax collections and lower spending in the prior year produced the carryover.
Multnomah County commissioners voted 5–0 on November 19 to authorize a grant application for design. The county would seek $4,728,771 in federal bridge funds and provide $541,229 locally. The preferred route would move motor traffic to a new crossing downstream and keep the 1914 bridge for people walking and cycling. The county is still seeking construction funding.
Gladstone’s school board is taking written feedback about the qualities it should seek in the next superintendent until noon Pacific on Thursday, December 3. The district plans to advertise the job December 16 and close applications January 29. The November 18 listening session has passed. The written form remains available.
Draft October 27 minutes in the November 17 board packet record a 5–0 vote to buy 2120 Douglas Street. Viking House students would build a facility there in 2027–28 for the district’s Douglas Street program. A second 5–0 vote extended the current lease through October 31, 2028, with $51,122.71 in rent for the first year. The minutes record the purchase authorization. A closing date and construction budget remain open.
Portland City Council District 3 · Updated brief ·
PBOT’s November 17 update confirms the new accessible curb ramps at SE 77th Avenue and Division Street are complete. Crews expect to return in December to finish the concrete refuge on the west side of the intersection. At SE 64th Avenue, the other crossing in the project, PBOT reports substantial completion in August. Portland’s voter-approved gas tax funds both, with budgets of $400,000 at 77th and $234,000 at 64th. The bureau has not published final payments on the project page.
Oregon City’s November 16 school-board workshop included a financial statement dated August 31. It shows $189.94 million in bond-fund revenue, $20.89 million in expenditures and $169.04 million in cash. The revenue includes bond proceeds, sale premiums, a $6 million state match and investment income. The cash balance alone cannot tell readers how much remains available after signed construction commitments.
A resolution in the November 12 packet would let Molalla River borrow to pay part or all of its pension liability. It cites an $18.18 million liability estimate and sets a 5% ceiling on the bonds’ interest cost. Savings would depend on investment returns exceeding borrowing costs. The posted document is unsigned, so it does not establish that bonds have been approved or sold.
The November 12 staff memo recommends buying up to $2 million in furnishings and related services from Meteor Education through a cooperative purchasing contract. The money would come from the 2024 school bond. Technology, food-service equipment and other items outside that contract would be bought separately. The memo establishes the proposed ceiling, but does not record the board’s vote or spending to date.
Draft minutes record a unanimous Nov. 9 vote to use a construction manager/general contractor for Grant Watts Elementary’s seismic rehabilitation. The method brings the contractor into design early, which staff said could identify problems before construction. The work is expected to include a new roof, with a goal of construction during summer 2027 before students return. The minutes do not name a selected contractor or establish the final contract price.
Silver Falls’ Nov. 9 finance presentation says an accounting change temporarily raised its fiscal 2026 General Fund ending balance from about $6.6 million to $6.9 million. Under auditors’ guidance, staff reversed payroll-based charges to a pension reserve and said the money must move through a budgeted transfer instead. The district plans to make the equivalent fiscal 2026 and fiscal 2027 transfers together in fiscal 2027. That explanation matters before treating the higher General Fund balance as extra money available for classrooms.
The draft October 27 minutes record a 6–0 vote to authorize participation in a statewide school pension-bond program. The resolution in that meeting’s packet caps the true interest cost at 5.25% a year. It gives Hillsboro’s estimated share of unfunded pension liabilities as $247.6 million at December 31, 2024. That estimate is separate from any amount eventually borrowed. Savings depend on whether the pension investments earn more than borrowing costs.
At its October 26 meeting, the board approved a six-month extension for the cell tower near Lake Oswego High’s main field. The district’s request said the previous term would end November 30. The extra time gives the district and operator Crown Castle room to negotiate a longer agreement. The public recording captures the motion and the chair announcing it passed.
Oregon revised its estimates for the same school year. In Canby, a $1.64 million drop in the state grant translates into a $51,885 drop in combined funding. Compare the two worksheets for all 29 districts.
The City project page, checked November 20, anticipates starting two years of construction in December 2026 on a replacement for the 1974 Force Avenue pump station near the Expo Center. The station serves Hayden and Tomahawk islands and an industrial and residential North Portland service area. The same page describes continuing easement, design and permit coordination, so it does not establish that construction has started or all approvals are complete.
Checked November 20, the library's location and construction-closure pages both list Hillsdale as reopening in early 2027 after its August 24 closure. The work includes a new roof, HVAC, lighting and more accessible restroom doors, supported by the voter-approved 2020 library bond. A linked explanatory article still describes construction lasting into December 2026. The checked pages do not identify when the schedule changed or a firm opening date.
Portland City Council District 1 · District brief ·
As checked November 20, PBOT labels the Jade and Montavilla multimodal project substantially complete. The City’s project list places it in districts 1 and 3. The project webpage gives a $9.094 million funding package, while the 2025 Fixing Our Streets annual report lists an $11,230,691 total project budget for Jade–Montavilla Connected Centers. The records reviewed do not explain whether timing, scope or accounting boundaries cause that difference. Neither number is a final paid-cost statement, so the difference alone does not establish an overrun.
Portland City Council District 2 · District brief ·
The transportation bureau says the N Willamette corridor improvements were completed in fall 2026, with 14 marked crosswalks, 42 accessible ramps and protected bike lanes among the changes. PBOT promises a post-project evaluation within two years, covering safety, travel choices and unintended effects. Its current maintenance notice schedules leaf collection between N Newman and Wabash on December 1 and the Carey–Portsmouth and Portsmouth–Newman sections on December 8. Crews may temporarily block bike lanes. This November 20 review records those published plans, rather than a new Council vote or measured safety result.
North Clackamas School District · District brief ·
The superintendent recommended a bond-funded contract with BRIC Architecture to evaluate the heating, ventilation and cooling systems at each school. The study would rank upgrades and estimate maintenance, energy and lifetime costs. The proposed fee covers assessment and recommendations. Each construction project would need its own budget.
Bidding closed November 19 on the second solicitation to replace process heating at the Columbia Boulevard Wastewater Treatment Plant. The first closed September 1. Both notices list contractor qualification requirements of $5.5 million for boiler work and $350,000 for systems work. Neither figure establishes what Portland will pay. A November report to Council places the rebid in a budget category above $2.5 million. The public notices give no reason for the rebid and name no winning bidder.
The financial report in Corbett’s Nov. 18 board packet projected $17.04 million in operating revenue for 2026–27, down from the adopted $17.23 million. Staff attributed a $250,000 reduction in one revenue category to a Multnomah Education Service District loan payment. Higher projected local revenue offsets part of that change, and the report says the opening fund balance still awaited the audit.
Portland City Council District 4 · District brief ·
On November 18, the full City Council advanced an ordinance allowing acquisition of property rights for SW Galeburn Street between Capitol Highway and 41st Avenue. Sidewalks, a protected shoulder and drainage would serve a route to Markham Elementary and Jackson Middle School, with funding from the Local Transportation Infrastructure Charge and Fixing Our Streets. The record schedules a second reading for December 2 at 9:30 a.m., with no adoption yet recorded. The Council Clerk does not accept verbal testimony at second readings, but generally accepts written testimony before the vote. The proposal allows negotiation and, if needed, eminent-domain proceedings with compensation, but gives no final easement prices.
The Nov. 18 board packet asked whether Reynolds should authorize pension borrowing if market conditions improve and what criteria should govern a sale. Its existing pension bond, issued in 2003 for about $81 million, runs to 2028. The financial adviser said the new debt payments would be fixed while investment returns could vary, leaving savings uncertain.
The district’s November 17 board packet proposes asking Oregon lawmakers for $500 million toward school districts’ pension liabilities and $400 million in additional special education funding. Both amounts are statewide requests. The superintendent asked directors to review the priorities before a first reading.
The November 17 General Fund forecast projects $805.5 million in ongoing revenue and $828.4 million in spending for fiscal 2028, a $22.9 million gap. Staff separately identified about $38.5 million in one-time resources before an unresolved business-tax refund risk. Those funds do not permanently close a recurring shortfall. This was an informational briefing, not adoption of specific service cuts.
The November 17 consent agenda listed a $10,000 Austin Family Foundation gift for the district’s homework club and a horizontal bandsaw valued at $18,000 for Newberg High School’s Tiger Manufacturing program. It also listed four $1,500 gifts for elementary schools. The bandsaw is donated equipment.
The superintendent’s Nov. 17 board packet proposes moving Lewis students to Duniway in 2028–29. PPS projects 533 students in a building with a planning capacity of 552, a margin of 19. The district expects more consistent grade-level staffing but identifies kitchen upgrades, longer walks and busy street crossings for some families. The board’s vote is scheduled for Dec. 15.
Portland is weighing a pause on new AI purchases. The November 17 draft gives existing contracts and pilots more room to continue while the City considers safeguards. Both drafts would require a Council exemption for renewals, extensions or amendments adding AI functionality. The change could let services continue through their current terms, including uses that have yet to receive a minimal-risk finding. The docket lists December 3, while its linked agenda history says December 2. Check the Clerk’s final agenda before planning to speak. The proposal is pending.
Centennial posted school-by-school charts on potential roof, electrical, plumbing and cooling projects and invited residents to a second forum on Nov. 16. Its Facilities Advisory Committee is scheduled to meet Dec. 2 before recommending priorities to the board. The charts show options under discussion.
Oregon’s November estimate puts Colton’s eligible transportation costs at $780,000 for 2026–27. The state formula covers 70%, or $546,000, leaving $234,000 of those costs for the district to fund elsewhere. The district’s total state school grant, which includes transportation, is projected at $6.66 million, within $1,400 of its June estimate.
Nutrition staff asked the board to raise the adult lunch price from $5 to $5.50, its first increase since the 2019–20 school year. Staff calculated a minimum price of $5.32 from federal meal reimbursement and commodity values. The proposal applies to meals bought by adults.
Several teachers in grades 3–5 put students in randomly assigned groups to work through problems at standing whiteboards. Visiting teacher candidates reported that 80% to 85% of pupils were engaged, on average, during the 30-minute sessions they observed. The district did not report a before-and-after measure of students’ math learning.
The county declared the entire Hansen property near NE 122nd Avenue and Glisan Street surplus on November 12, starting a public process before any sale. Comments are due February 10, 2027, and a community meeting is scheduled for December 2, 6–7 p.m., at Midland Library. The county lists a $6.1 million assessed market value but cautions that it may not reflect redevelopment potential or current market conditions. No sale price or buyer is established.
On its English early-literacy assessment for kindergarten and first grade, Beaverton reported that 59.6% of tested students at Title I schools were on track or above benchmark, compared with 84.9% at other schools. The difference is 25.3 percentage points. The district screens students three times a year.
The county’s fiscal 2025–26 Supportive Housing Services report says 662 people entered permanent supportive housing or rapid rehousing and reports 96% retention among people in permanent supportive housing. Its spending chart includes $19.3 million in long-term rent assistance and $12.5 million for shelter. These are county-reported program results. The categories serve different groups and should not be added together as a count of unique people.
The enrollment report in the November 10 board packet counted 392 K–12 students on November 1, down from 426 a year earlier, or about 8%. The K–6 count fell by 20 and the high school count by 14. Overall enrollment was unchanged from October.
Vernonia’s General Fund recorded $2.31 million in revenue and $1.99 million in spending from July through October. Revenue rose $51,146 compared with the same months in 2025. The district told directors that payroll and other commitments still lie ahead and auditors had yet to confirm the opening balance.
Commissioners approved the Jail and Community Corrections Expansion project plan on November 10, covering planning phases 2 and 3. Strategic Investment Program funds pay for that planning, while staff say capital construction and operating funds still must be secured. The presentation describes a larger facility as at least seven years away if the project encounters no obstacles.
The district’s 2025–26 report identifies uneven attendance as a barrier to learning even as math proficiency grew in grades 3, 4, 7 and 8. Elementary leaders say they are considering scheduling design projects and LEGO robotics early in the day to encourage timely arrival. The board’s November 9 agenda invited public input on the report.
The board’s November 9 agenda paired an early-year student performance report with a review of growth targets. The district’s published plan budgets $281,749 for two licensed student success coaches in 2026–27 and $50,000 for early college opportunities. These allocations give families a way to follow whether individual programs reach students and improve outcomes.
The district reported that 52% of students tested reached its reading benchmark and 42.3% reached its math benchmark. Scappoose set the cutoff at the 55th percentile on its new STAR assessments. Staff told the board the tests, given three times a year, help identify students for intervention or enrichment.
The Nov. 4 board finance report said September payroll pointed to a year-end fund balance of 6.3%. District staff cautioned that they needed two months of full payroll to make a reliable projection. The district also added a second page to the finance report after board members requested more detail.
The district’s November 2 project log says crews lifted the high school addition’s exterior walls into place in October. Crews also installed the auxiliary gym’s stormwater system and began work on its mechanical and electrical systems. The district’s schedule targets fall 2027 for the high school addition to open.
West Linn-Wilsonville School District · District brief ·
The board’s Nov. 2 agenda listed proposed Resolution 2026-06 for action on a pension bond side account. Under Oregon’s pension system, employers can set aside a lump sum that is invested with the retirement fund and can lower their future contributions. The meeting agenda does not establish that the district issued debt.
Portland City Council District 1 · District brief ·
In its November update, Portland Parks & Recreation said construction was nearly complete but fresh grass needed time to establish. The bureau estimated a December 2026 opening for the larger dog area and spring 2027 for the smaller area, replacing the page’s earlier general fall target. The approximately 43,663-square-foot fenced layout separates large and small dogs and adds accessible parking and a curb ramp. These are projected opening dates, not a report that either area has reopened.
Washington County’s October 30 update reports construction and intermittent daytime lane closures between Baseline Road and Quatama Street. The $31.4 million project includes a replacement Beaverton Creek bridge, sidewalks and buffered bike lanes. The county schedules the full bridge-replacement closure from July 2027 through October 2028, with overall construction expected to finish in December 2028.
The district said its unemployment cost for employees on ten-month contracts exceeded $400,000 last year, up from about $30,000 in 2022–23. Its new finance group brings students, employees, budget committee members and school board members together to examine district finances. The superintendent and board are taking their funding case to state lawmakers ahead of the 2027 session.
An Oregon career and technical education grant supports a new Parkrose High School construction management pathway. The Oct. 26 board agenda included the grant, and the district’s staffing plan calls for a temporary half-time teacher to build the curriculum, prepare practical training and deliver the first class.
The County's October 23 project update says its feasibility study found an all-way stop sufficient at Herman and Cipole roads. The wider corridor project between 124th and Cipole includes walking and cycling improvements and has a published $17.3 million estimate through MSTIP 3f. Construction is anticipated from December 2027 to September 2029. The study result is a design-stage finding, not a completed safety outcome.
David Douglas listed a dual-language presentation at its Oct. 22 school board workshop. Lincoln Park’s program teaches primarily in Spanish in the early grades and moves toward equal time in Spanish and English by fourth or fifth grade. Kindergarten and first-grade entry uses a weighted lottery, while later entrants may need to demonstrate proficiency in the partner language.
Riverdale voters approved a five-year levy of $1.67 per $1,000 of assessed value, up from $1.37. Multnomah County announced Oct. 19 that it had begun mailing this year’s tax bills, and its tax roll lists the new rate. Riverdale projected $7.53 million over five years to support staffing and programs, including International Baccalaureate.
Estacada reports the largest one-year rise among 88 Oregon districts that tested at least 75 third graders. Its 2025–26 proficiency rate was more than 10 percentage points above the state rate. District leaders point to training for all K–2 teachers and additional tutoring. The comparison covers successive classes of third graders and cannot isolate the effect of either change.
Washington County's September 30 update reports continuing construction between Springville and Brugger roads, with intermittent weekday lane closures and priority for buses and emergency vehicles. The $7.8 million estimate covers a center turn lane, bike lanes, sidewalks, drainage and an enhanced crossing, funded through the North Bethany County Service District for Roads. The published completion target is August 2027, not a finished-project outcome.
The county plans a new two-lane bridge south of Fern Flat Road, with a temporary bypass because no detour route is available. The September 28 update says design was nearly finished and permits and right-of-way work were underway. The posted $2.8 million estimate uses MSTIP and Road Fund money, with construction expected from May 2027 to winter 2028–29.
The County adopted Resolution 2026-048 on July 2 for a 10 percent concept design covering NE Sandy Boulevard between 201st and 230th avenues. The resolution directs final design and construction planning for the 201st–223rd segment, including a midblock crossing, sidewalks and bike lanes, and identifies a previously awarded regional grant. The project page was reviewed November 2. That review does not establish that construction has begun or the full corridor is funded.
Newberg-Dundee Public Schools · District follow-up ·
The district counts on four fewer bus routes and would keep paying to maintain both buildings. Its worksheet shows how much each change saves and where students would go.
The Nov. 18 board packet listed interim student-growth targets, the annual restraint and seclusion report, and planning for 2027–31. The public agenda links the safety report and lists all three as reports.
The Nov. 18 agenda proposed extending two community budget committee terms through December 2029. It also included a financial update from the interim business manager. The posted agenda gives the proposed terms, while the vote would be documented in the minutes.
Portland City Council District 1 · District brief ·
Portland City Council advanced an ordinance that would let the transportation bureau acquire property rights along Stark and Washington. Council scheduled the second reading for December 2 at 9:30 a.m. The $11.7 million estimate covers design and construction along the corridor. The ordinance does not set prices for individual easements.
The Nov. 18 work session set aside public discussion for an update on the district’s strategic plan. A superintendent evaluation and labor negotiations were listed separately for executive session. The agenda records no vote on the plan.
Portland City Council District 2 · District brief ·
The transportation bureau canceled the November 23 paving day for portions of NE 66th and 68th avenues. Its November 18 update gave no replacement date. The broader project adds sidewalks and manages stormwater, financed mostly through the Local Transportation Infrastructure Charge.
North Clackamas School District · District brief ·
Clackamas County’s November 17 tally put Measure 3-639 at 38,359 yes and 19,434 no. The district proposed $245 million for capital work. The county marked the results unofficial pending certification.
The Nov. 17 board packet proposes closing ten schools, with changes phased in over two years. Before a scheduled Dec. 15 board vote, PPS lists a Nov. 21 information session at McDaniel High School and a Dec. 3 listening session at Benson High School.
The district dropped plans to move grades 5 and 6 into the middle school and grades 7 and 8 into the high school. Growing high school enrollment and the cost of alterations narrowed its options. The earlier elementary grade changes are already in effect.
The county reopened both lanes at Dairy Creek Slough more than a month ahead of schedule. Sinkholes had developed in both lanes. County road funds supported a project estimated at $2.7 million. Guardrail work was scheduled for November 20.
The November 16 board agenda included a resolution to authorize selling pension obligation bonds, alongside a fiscal update and a budget committee appointment. The agenda presents a recommended motion and gives no sale price or completed transaction.
West Linn-Wilsonville School District · District brief ·
The November 16 agenda focused on how educational technology is used across grade levels and how the board would hear from the people using it. The district described the session as a discussion and scheduled no decision on technology policy.
The district’s November 13 notice put a bond update and two policy reviews on the November 16 special-session agenda. The notice records what the board planned to discuss. It gives no new project cost or vote.
The district and its Native American Parent Advisory Committee invited families to David Douglas High School on Nov. 13 for drumming, books and a celebration of student achievement. Its November notice also lists Nov. 25 family–teacher conferences and which students have no school.
The district posted materials from its November 12 budget event. It projects that spending will exceed revenue by about $42 million in 2027–28. Its timetable places community feedback before the superintendent’s recommended budget and the school board’s June adoption.
Multnomah County’s Nov. 12 report counted 13,723 yes votes and 8,951 no votes on Measure 26-268, a $162.5 million school facilities bond. That is 60.52% support among votes on the measure. The county scheduled certification by Nov. 30.
Portland City Council District 1 · District brief ·
Council authorized the transportation bureau to offer two parcels left from a road project at fair market value. Selling would end City upkeep and produce one-time revenue. The Housing Bureau considered holding the land for housing but cited the small parcel sizes. The authorization names no buyer or final price.
The county reported that most work between NE Halsey Street and Fairview Elementary was complete in October, including bike lanes and a sidewalk. State Safe Routes to School and county transportation funds supported the estimated $2.6 million project. Stormwater work continued.
A county memo found that a distribution formula overpaid some library cities and underpaid others over three fiscal years. The worksheet was fixed. City managers favored a single adjustment in 2027–28. The memo illustrated $43,812 more for Estacada and $37,995 less for Oak Lodge, with no net change across the allocations. The November 10 item was informational.
The school board’s Nov. 10 agenda listed a proposed pension-bond authorization for action, alongside reports on district finances, student assessments and public safety. The packet includes the draft resolution and a staff explanation.
The November 10 agenda paired the auditors’ report on the 2025–26 financial year with a proposed plan of action. The board also listed October financial statements for review. The district posts the meeting video alongside the agenda.
The district listed in-person and remote access for its November 10 school board meeting. The meeting page also links the October 19 workshop agenda on goals for the board and superintendent and the superintendent’s evaluation. A November decision on those items is unverified.
Draft board minutes report that a facilities committee favored remodeling and expanding the existing school. Preliminary construction estimates ran from about $65 million to $97 million across the options and omitted some demolition or gym costs. The committee expected to revisit costs in December.
Tigard-Tualatin School District · District brief ·
The district named Alberta Rider Elementary in its November 5 boundary plan. It says declining enrollment left schools underused and this option would require fewer students to move. Families can send feedback through the district’s closure and boundary page.
The school district identified Alberta Rider for closure in 2028–29 as enrollment falls. Students would move to Deer Creek or Art Rutkin, and the building could house other students during renovations. Staff estimated this would avoid $2.5 million in temporary classrooms, a bond cost separate from annual operating savings. The elected school board has final closure authority.
The district said early returns favored its replacement bond and described a citizen oversight committee it would form after certification. The measure would replace Silverton Middle School and combine three schools in a new K–8 building.
Tigard-Tualatin School District · District brief ·
About 30 students took part in an October design workshop, according to the district’s bond update. They gave the architects feedback. The next plans offer a way to see which student ideas survive into the design.
Portland City Council District 4 · District brief ·
Portland Parks & Recreation reported 363 responses in its first design round for a one-acre park at NW 20th and Pettygrove. The $5 million development-charge budget also covers site cleanup. The bureau expected to share initial designs in early 2027.
The district invited students, parents and staff to share feedback with Sodexo, its school-meal provider. The district’s notice links to the questionnaire. What changes to menus or service will families see from the responses?
The October 27 school board packet set aside a work session to examine research, local student outcomes and how the dual-language program could improve. The packet framed the item as a discussion and proposed no change to enrollment or instruction.
Staff proposed adding state reading and math test proficiency to the Lake Oswego Diploma and shifting a half credit from Advanced Communication Skills to electives. The Oct. 26 memo put the district-specific changes before the board for a second reading.
Staff asked the board to put 25% of field-use fees into its construction excise tax fund as tax receipts declined. The October 26 memo reported $2.1 million reserved for turf replacement and estimated the next field would cost about $500,000. The memo records a request for board action.
Washington County sought public input on plans for sidewalks, drainage and a signal upgrade at 185th Avenue. The county estimates $25 million and expects construction to begin in spring 2028. The November 3 open house has passed.
Canby’s facilities committee toured Ninety-One School and compared state assessments of the buildings with enrollment forecasts. The district expects its repair recommendations around December 3. School consolidation decisions follow a separate process.
West Linn-Wilsonville School District · District brief ·
The October 20 report lists $13.4 million spent and $22.1 million committed. Summer projects were closing out, and the district had submitted its Wood Middle School grant agreement to the state. The two figures describe different stages of spending.
Multnomah County and New Walnut Park LLC began exploring housing, child care and health services at the historic Albina site. The 1803 Fund supports this first phase. A final design, project cost and transfer of the property were still open, with feasibility findings expected in 2027.
Riverdale’s Oct. 15 notice outlined a week of media literacy, internet safety and AI education for Oct. 19–23. High school advisory groups were to discuss how AI is used at Riverdale, and the district shared online safety resources with families.
Clackamas County reported a typical 2.96% increase in the total property-tax bill in the Colton school district for 2026–27. The assessor also reported a lower emergency radio bond. The area-wide figure combines levies from several public bodies. A property’s tax statement shows how much actually went to its school district.
Clackamas County lists the school bond rate for safety and repairs at $2.8960 per $1,000 of assessed value, up from $2.8162 as a bond retired. The difference is $7.98 a year per $100,000 of assessed value, before other taxes.
The assessor reports a lower school bond levy in the area it labels Sherwood School District. The county’s typical total property-tax bill there still rose 2.44%. A property’s statement shows the other districts that contributed to its bill.
ODOT reported that Cornelius Pass Road reopened after replacement of the bridge built in 1946. The county lists a $6.5 million budget. The new bridge carries two travel lanes with shoulders across Rock Creek.
The Oct. 6 bond advisory committee materials cover middle-school programs and possible shared space with the high school. The school board extended the planning process through June 2027 so a committee could weigh options before recommending a possible bond.
Oregon’s education department awarded the district a career education grant for three secondary schools to share a hands-on learning site. Students in carpentry, plumbing and construction programs are slated to work with licensed tradespeople.
The district introduced families to Sandy High’s new aviation program in its October magazine. The school describes the pathway as a blend of classroom work and technical training. Enrollment and student outcomes will show how far it reaches.
The audit in the March 9 board packet reports $1.78 million across the district’s governmental funds at June 30, 2025. Of that, $949,616 was unassigned. Readers can compare that starting point with the district’s subsequent budgets.