A Tryon Media Group publication
Our publications
Portland, In View
District newsPortland City Council
city council district

Portland City Council District 2

Voters in each of four districts elect three councilors. The full council votes on ordinances and the city budget.

Explore city spending by district · Track the Portland Harbor cleanup · RSS for this district

From the public record

Public record
Filed November 20, 2026

Eliot neighbors can weigh in on lights over Albina One Plaza

Portland Permitting & Development makes the land-use decision.

Portland Permitting & Development published plans on November 20 for lights suspended across the plaza between Albina One and the Paramount Apartments in Eliot. Cables would attach to the facing walls of the existing buildings. The Housing Bureau reports 94 affordable homes at Albina One. City permitting staff will consider the design guidelines and written comments before approving the application, adding conditions or denying it.

Strings of plaza lights hang between two stylized apartment walls.
Editorial illustration
Why it matters here
Residents of the two buildings can inspect the placement of the overhead lights while city staff are still reviewing the design.
What you can do
Open the notice and site plan. Send comments to the planner named on page 1 by 5 p.m. December 4, and include case LU 26-084275 DZ. Comments become part of the public record. How to comment and lighting drawings (PDF)

Question we’re following Which design conditions, if any, will the City require for the proposed lighting between the apartment buildings?

Source checked
Filed November 20, 2026

Willamette Boulevard shifts from construction to maintenance and measurement

Portland Bureau of Transportation

The transportation bureau says the N Willamette corridor improvements were completed in fall 2026, with 14 marked crosswalks, 42 accessible ramps and protected bike lanes among the changes. PBOT promises a post-project evaluation within two years, covering safety, travel choices and unintended effects. Its current maintenance notice schedules leaf collection between N Newman and Wabash on December 1 and the Carey–Portsmouth and Portsmouth–Newman sections on December 8. Crews may temporarily block bike lanes. This November 20 review records those published plans, rather than a new Council vote or measured safety result.

A sweeper brush and autumn leaves sit above a marked cycle lane.
Editorial illustration
What PBOT says it built
  • New marked crosswalks14
  • ADA ramps42
  • Bus-stop upgrades19

Selected improvements reported complete in fall 2026 on N Willamette Boulevard. These counts describe construction outputs; they do not yet measure changes in crashes, travel speeds or access. Source

Why it matters here
For someone using a protected bike lane, autumn leaf removal affects whether the lane is usable that day. The promised evaluation addresses longer-term safety and travel patterns.
What you can do
Find your stretch of Willamette in the maintenance notice and check its leaf-removal date before riding. Completed features, evaluation plan and leaf dates

Question we’re following What before-and-after measures will PBOT publish, and will winter maintenance keep the new protected lanes usable?

Public record

Weather pushes back paving on two Cully streets

Portland Bureau of Transportation

The transportation bureau canceled the November 23 paving day for portions of NE 66th and 68th avenues. Its November 18 update gave no replacement date. The broader project adds sidewalks and manages stormwater, financed mostly through the Local Transportation Infrastructure Charge.

A yellow paving roller sits among orange cones on a wet residential street.
Editorial illustration
Why it matters here
People on the affected blocks need a new paving date to know when to move a car or plan around driveway access.
What you can do
Check the current Cully construction schedule for the replacement date before making arrangements on NE 66th or 68th. Current construction schedule

Question we’re following When will residents on those blocks have a confirmed paving date?