Newberg lists a $10,000 homework-club gift and a bandsaw for student manufacturing
Newberg-Dundee’s school board reviews donations on its consent agenda.
The November 17 consent agenda listed a $10,000 Austin Family Foundation gift for the district’s homework club and a horizontal bandsaw valued at $18,000 for Newberg High School’s Tiger Manufacturing program. It also listed four $1,500 gifts for elementary schools. The bandsaw is donated equipment.
Editorial illustration
Why it matters here
The homework club can spend its cash gift. Manufacturing students receive a specific piece of shop equipment whose estimated value also appears in the donations list.
What you can do
Read page 6 of the November 17 packet to see which gifts are cash, who receives them and how the district values the bandsaw. Donations list, school board packet page 6
Question we’re following How many students will the homework club serve, and what new work will manufacturing students be able to do?
The district counts on four fewer bus routes and would keep paying to maintain both buildings. Its worksheet shows how much each change saves and where students would go.
What changed
The Newberg-Dundee board voted to close Ewing Young and Joan Austin elementary schools for 2027–28. Both stay open this school year.
Why it matters here
The district projects $1.18 million in annual savings. Families are still waiting to learn which school their child will attend and how long the bus ride will take.
What you can do
Check the board calendar for boundary and transportation updates. Families can raise a specific route, class-size or transition question through the district’s public comment process. How to comment
Editorial illustration
On November 17, the Newberg-Dundee school board voted 5–2 to close Ewing Young and Joan Austin elementary schools for 2027–28. Both stay open this school year. The chosen plan, Model D, keeps the current grade configuration. The vote settled which buildings will close. Families still need a boundary map, bus schedules and grade-by-grade staffing.
The district says a separate $5.7 million reduction last spring balanced its 2026–27 operating budget. It argues consolidation can help rebuild reserves and spread teachers more evenly across schools. The annual estimate below starts with moving students and services into other buildings. It includes no income from selling or leasing either property.
How the district gets to $1,182,526
Estimated annual change in costs under Model D
Budget line
Projected saving
Non-instructional staffing at the closing sites
$1,014,828
Utilities at the closing sites
$80,198
Four fewer bus routes
$150,000
An additional half-time teaching position
−$62,500
Net recurring savings
$1,182,526
The district budgets half the current utilities and keeps half a custodial position at each closed site. Each route removed is valued at $37,500 a year. The model has no separate line for one-time moving or transition costs. Its total is a recurring projection. Actual savings will depend on staffing, routes and building use.
Close the same two schools and reorganize grades into K–4, 5–6 and 7–8
$1,395,026
985
These are three of the five models in the district’s comparison, using September 10 enrollment. Model H projected $212,500 more in annual savings than D and about 645 more students changing buildings. Choosing D reduced disruption relative to H. It still means giving up two school communities. Model C had another advantage. Just two school-and-grade groups would have fewer than two teachers, compared with five under D, out of 24 groups in each model.
Four elementary schools under the proposed boundaries
Receiving school
Incoming students
Projected enrollment
Rated seats
Seats left
Antonia Crater
212
458
500
42
Dundee
18
234
350
116
Edwards
30
438
700
262
Mabel Rush
84
409
625
216
The school-by-school worksheet assigns 344 incoming students. The overview rounds that to about 340. Antonia Crater would reach 458 of 500 rated seats, leaving 42. A building’s spare seats say little about space for a particular grade, special education or counseling. These are planning assumptions. A family’s assignment will depend on the final boundaries.
Model D barely changes the modeled average elementary class size, from 25.03 to 24.79. It does narrow the projected spread in grade-level averages, from 14–37 to roughly 22.5–27.3. The November 1 count offers a different measure of crowding. Ten actual K–5 homerooms had 30 or more students. Fall 2027 homeroom rosters will show whether fewer children actually sit in those large classes.
The district’s voluntary community form received 34 responses between October 16 and November 6. Its analysis counted 19 mentions of keeping school communities together, 15 of class sizes or combined grades, and eight of transportation or walkability. People could raise several issues. These responses show what some participants valued and cannot stand in for every family’s view.
How long will the longest rides be? Will the schools have room for small-group support? When the first year closes, do the payroll, utilities and transportation accounts show the projected savings after moving costs? We’ll compare the boundary proposal, route plans, fall rosters and actual spending with the model.
Newberg-Dundee board votes to close two elementary schools
Ewing Young and Joan Austin elementary schools will close for 2027–28. The board’s chosen plan sends students to four other elementary schools and projects $1.18 million in annual savings. Attendance boundaries, staffing and transportation still need transition plans.