A Tryon Media Group publication
Our publications
Portland, In View
Public education · Clackamas / Washington

Tigard-Tualatin School District

Public records, board decisions and ways to participate in Tigard-Tualatin School District.

RSS for this district

From the public record

Updated record
Filed November 23, 2026

Tigard-Tualatin’s November 23 agenda puts four construction purchasing proposals before the board

Tigard-Tualatin School Board, acting as the district’s Local Contract Review Board, and district operations staff.

The November 23 agenda asks directors to let the district consider qualifications alongside price for four projects covering windows at Tualatin High, theater lighting, playgrounds and fire alarms. Staff cite the short summer construction season. The draft playground findings estimate $4.8 million across five campuses. The four advertised hearing times and the 4 p.m. speaker signup deadline have passed. The regular board meeting is scheduled for 6 p.m.

Wall cladding, a spotlight, play equipment and an alarm bell represent four contracting hearings.
Editorial illustration
Why it matters here
The board is deciding how contractors can compete. The final price for each job comes later, when the district awards a contract.
What you can do
Follow the November 23 meeting on the district’s board calendar. The agenda lists each resolution separately. Check the minutes afterward for the vote on each one. District meeting calendar and livestream information

Question we’re following What weight will qualifications and price receive, and how will the final contract prices compare with the estimates?

Earlier reporting · November 20, 2026

Tigard-Tualatin’s contract hearings start Monday afternoon, before its board meeting

Four public hearings on Nov. 23 start at the district office with Tualatin High’s envelope project at 1 p.m., theater lighting at 1:30, playgrounds at 2 and fire alarms at 2:30. The draft findings seek permission to weigh contractor qualifications alongside price. The playground package carries a $4.8 million construction estimate across five campuses. The regular board meeting starts at 6 p.m., with its own 4 p.m. deadline to register for public comment. These are proposed contracting methods, not awarded construction contracts.

Why it matters here
The public hearings happen before the evening meeting. Arriving only at 6 p.m. would miss them.
What you can do
Choose the relevant Nov. 23 hearing at 6960 SW Sandburg Street. For evening board comment, follow the separate 4 p.m. signup instructions. All times are Portland time. Monday’s four hearing times and location
Earlier reporting · November 20, 2026

Tigard-Tualatin will consider how to award four school construction contracts

The November 23 agenda asks directors to allow competitive proposals weighing price and contractor qualifications for playgrounds, fire alarms, auditorium lighting and Tualatin High’s windows. Staff cite tight summer construction schedules. The regular meeting starts at 6 p.m., and readers who want to speak can sign up by 4 p.m. that day.

Why it matters here
Hiring on price and qualifications could help the district finish work during summer break. The board must decide how it will weigh those factors for each job.
What you can do
To speak at the November 23 meeting, use the board agenda’s sign-up instructions by 4 p.m. Portland time that day. November 23 agenda, public comment and resolutions
Public record

Tigard-Tualatin identifies Alberta Rider for closure in 2028–29

Tigard-Tualatin School District

The district named Alberta Rider Elementary in its November 5 boundary plan. It says declining enrollment left schools underused and this option would require fewer students to move. Families can send feedback through the district’s closure and boundary page.

A pencil traces a possible boundary beside an elementary school on a colored map.
Editorial illustration
Why it matters here
Which attendance boundary the board adopts would determine which Alberta Rider families move to a different school and how far they travel.
What you can do
Use the district’s closure and boundary page to review the proposed change and send feedback about its effect on your household. Read the public record
Public record

Fowler students help shape their new middle school

Tigard-Tualatin School District

About 30 students took part in an October design workshop, according to the district’s bond update. They gave the architects feedback. The next plans offer a way to see which student ideas survive into the design.

Student hands place movable classroom blocks on an architectural plan.
Editorial illustration
Why it matters here
Students use the building differently from adults. Their workshop gives families a concrete way to judge how well the eventual plans reflect daily school life.
What you can do
Read the October workshop recap, choose a student suggestion and look for it when the district publishes the next design. Read the public record