A Tryon Media Group publication
Our publications
Portland, In View
Public education · Clackamas

North Clackamas School District

Public records, board decisions and ways to participate in North Clackamas School District.

RSS for this district

From the public record

Public record
Filed November 20, 2026

North Clackamas reports high-school test gains and middle-school math gaps

North Clackamas teaching and learning staff report results to the school board.

The district’s November 19 report puts Grade 11 math proficiency at 24.8%, up from 13.2% a year earlier, and English language arts at 46.9%, up from 36.7%. Math proficiency fell in grades 7 and 8. The district also introduced separate fall interim-test baselines and plans its first same-test growth comparison in winter 2027.

Geometry tools and reading books rest on two school desks.
Editorial illustration
Grade 11 proficiency, one year apart
  • Math13.2% → 24.8%
  • English language arts36.7% → 46.9%

Share meeting the standard in each year’s tested group. These cohorts can differ. Source table on page 6. Source

Why it matters here
Districtwide gains can coexist with grades needing more support. Annual state tests and interim classroom checks measure different things.
What you can do
Compare the grade-by-grade state results on page 6, then use page 27 to track the promised winter comparison. Assessment report, state results page 6 and comparison plan page 27

Question we’re following What changes in participation and classroom support explain the pattern, and what will the winter check show?

Public record
Filed November 20, 2026

North Clackamas proposed spending up to $411,530 to study school cooling

North Clackamas School Board and district chief of operations

The superintendent recommended a bond-funded contract with BRIC Architecture to evaluate the heating, ventilation and cooling systems at each school. The study would rank upgrades and estimate maintenance, energy and lifetime costs. The proposed fee covers assessment and recommendations. Each construction project would need its own budget.

Blue paper air currents spiral from a classroom air vent.
Editorial illustration
Why it matters here
A school’s place in the proposed ranking could affect how long its students wait for cooler classrooms and how much the eventual work costs.
What you can do
Read the scope on pages 102–103 for the costs BRIC would estimate and the work that would still need a construction budget. November 19 board packet, pages 102–103

Question we’re following Which schools would receive cooling first, and when will the district release the rankings and estimated costs?

Public record

North Clackamas school bond leads with 66% of counted votes

North Clackamas School District

Clackamas County’s November 17 tally put Measure 3-639 at 38,359 yes and 19,434 no. The district proposed $245 million for capital work. The county marked the results unofficial pending certification.

A ballot drops into a transparent box beside a model school.
Editorial illustration
Why it matters here
The measure would fund long-lived building work. Its financing depends on the election result moving from a preliminary count to certification.
What you can do
Find Measure 3-639 in the November 17 county report and divide its yes votes by the total yes and no votes to check its lead. Read the public record